Present Project

Rail Track Project

Indian Railway
1) Pre & Post tamping track measurement survey using AMBERGE  trollies system under the jurisdiction of Sr.DEN (East/CKP.  (2nd Call)  Total -124 KM from Nov. 2019 to till date…

2) Pre & Post tamping track measurement survey using AMBERGE  trollies system or similar under the jurisdiction of ADEN(West)/CKP) Total -140 KM from Nov. 2019 to till date…

M/S Larsen&Turbo Limited
i) WDFC , CTP 1 & 2 Project
Amberg Trolley operation on rail track under L & T, WDFC Project (CTP 1 & 2) at  Jaipur. From Rewari to Abu road  – 2200KM from June 2019 to till date…

ii)DMRC CT-11 Project, Bahadurgarh Depot, Haryana
Laying Rail track Work, Installation of turnout, Scissors, Derailing switches, Installation of Buffer Stops, Installation of Level Crossing, Installation of Embedded Rail, Ballastless Track with all Fittings and Fastenings etc.. From May 2017 to till date.

iii) EDFC CP 303 Project,Meerut
3D Topographic  survey, DGPS Survey,  Traversing , bench mark fixing,Trangulation, RoW Validation, cross section, stakeouts, Control Pillar fixing, Bench mark Pillar fixing , Network Adjustment and Processing of Prime Traverse,Structure work, Final location survey, preparing drawing, report by using Various software etc.. From May 2018 to till date.

Road Project

M/S Reliance Infrastructure Limited  
1)Field Survey works for Six (6) laning of Field Survey & Investigation Works for Bihar to Jharkhand, Gorhar Section of NH 2 from Km. 249.525 to Km. 320.810 in state of Jharkhand under NHDP Phase – V from March 2018 to till date…

2)Field Survey works for Six (6) laning of Aurangabad to Bihar – Jharkhand Border (Chordaha) of NH-2 from Km. 180.000 to Km. 249.525 in the State of Bihar under NHDP Phase – V from March 2018 to till date…

Metro Tunnel Project

M/S L&T STEC JV MML3 Project , Mumbai
Supply of  survey teams for monthly basis from Jan.2020 to till date…

Bridge Project

M/S DAEWOO – L&T JV, New Ganga Bridge Project (Six Line), Patna
Supply of Four survey teams at New Ganga Bridge Project, Patna for construction development works. From July 2019 to till date..

Project Sucessfully Completed & Handed over….


Rail Track Project

M/S Larsen&Turbo Limited

i) WDFC CTP -14 Project

3D Topographic  survey, DGPS Survey,  Traversing , bench mark fixing, Trangulation, RoW Validation, cross section, stakeouts, Control Pillar fixing, Bench mark Pillar fixing , Structure work, Final location survey, preparing drawing, report by using Various software etc. From April 2017 to Feb.2019

ii) WDFC , CTP 1 & 2 Project
Supply of seven survey teams at different packages (A, B, C& D) for construction development works. From2014 to August 2019

M/S RITES LTD.
1)Topographical and final location survey for the proposed fast harborsub·urban corridor between CSTM – Vashi – Panvel section with connectivity to proposed NaviMumbal Airport in Mumbai.From May 2012 to Nov.2016

2)Topographical and final location survey for the proposed new sub-urban corridor between Virar- Vasil- Diva • Panvel section in Mumbai.From May 2012 to Nov.2016

M/S Alstom Transport India Limited, DMRC Vinod Nagar Depot, Delhi
Track laying Work, Installation of turnout, Straight Track, Scissors, Derailing switches, Installation of Buffer Stops, Installation of Level Crossing, Installation of Embedded Rail, Ballastless Track with all Fittings and Fastenings etc.. From July 2017 to June 2019

Airport Project

M/S Larsen&Turbo Limited
i) DIAL Project, New Delhi
1)Conducting topographic survey, Road survey, traverse survey, GPS control point Fixing for Proposed IGI Airport and existing Airport. Traversing, GPS survey Work and supply of survey team for (14 teams) construction development works  at IGI Airport from 2007 to 2010

2)Supply of survey teams for traversing by total station, bench mark fixing by Auto level, lines and stakeouts for various construction jobs. Making drawing and submit reports. From April-2007 to Dec 2012

ii) BIAL Project, Bangalore
Supply survey team for topographic survey, GPS control point Fixing Traversing, GPS survey works  at BIAL Airport, Bangalore  from 2011 to 2012.

Refinary Project

M/S Reliance Energy Limited
i)Yamuna Nagar ,Haryana
1)Supply of survey team for 2x300MW DCRTPP at Yamuna Nagar ,Haryana with latest own total station we are conducting engineering survey for traversing by total station, bench mark fixing buildings lay out & lines, stakeouts for various construction job survey. Area calculation, preparing drawing, report by using various software. From March 2005 25th April2008.

ii)Hissar ,Haryana
Supply of survey team for 2x600MW DCRTPP at Hissar ,Haryana for bench mark fixing buildings lay out & lines, stakeouts for various construction job survey. Area calculation, preparing drawing, report by using various software. From March 2007 to Oct2009.

iii)Raghunathpur ,West Bangal
Supply of survey team(Three teams) for 2x600MW at Raghunathpur ,West Bangal for traversing by total station, benchmark fixing buildings lay out & lines, stakeouts for various construction job survey. Area calculation, preparing drawing, report by using various software. from March 2008 to till date.

Metro Project

M/S Larsen&Turbo Limited
i)DMRC PKG CC 06- Viaduct Badarpur Faridabad Corridor Project, Haryana
Supply of Six survey team for  for traversing by total station, bench mark fixing taking profile,3D topographic  Survey,  cross  section,  stakeouts  for  various  construction  job  calculation, preparing drawing, report by using various software. from February 2012 to Dec 2014.

ii)DMRC PKG CC 27 Project, Delhi
Construction of Under Ground works of tunnelling and stations for DMRC PKG CC 27 Project, Delhi from February 2012 to Sept.2017 

iii)LKCC – 01 Project, Lucknow
Supply eight survey teams for all survey related works from Dec.2014 to Dec.2016

iv) UdyagBhawan& Green Park Metro Project, Delhi

Supply of survey team for UdyagBhavan we are conducting engineering survey for Triangulations by total station, bench mark fixing by digital level, 3D monitoring for buildings & lines, stakeouts for various construction job. Area calculation, preparing drawing, report by using various software. From November 2006 to March 2010

M/S DMRC Limited

1)Alignment centre line marking on Soffit of property deck area at Khyber Pass

2)DGPS Point Fixing ,Traversing ,Bench Mark Fixing For AMEL (Airport Metro Express Line) Total – 26 KM

M/S Gamman India Limited
Works survey works for construction of viaduct including related works for5.27km length including station area from CH-6400 to ch 12570 between VIPBazar to NICCO park in newgaria airport corridor of Kolkata Metro Railway
Line.From March 2014 to till date Dec 2015.

M/S SOMA ENTERPRISES LIMITED
i)Kochi Metro Rail Project
we are conducting survey for construction development works. From July 2013  to Sept 2017.

i)Bangalore Metro Rail Corporation
we are conducting survey for construction development works. From Oct 2010 to Sept 2015.

Transmission Line Project

M/S Sterlite Power Grid Ventures Limited.
Details Pre – bid Survey for SPGVL  at Haryana- Rajasthan – Gujarat Section from 05/04/2019 to 30/04/2019
Measure Work: GPS control point fixing, Topography, Traversing,Leveling etc.  Total – 406.087KM

Construction Settingout & Development

M/S Larsen &Turbo Limited
The setting out and construction surveying are the core competences of OMSE. Besides the highly specialized Construction Setting out advance surveying, OMSE provides all surveying services for all types of construction works. Whether you are building a power station, a road or a residential complex or want to build a private single-family house – OMSE is your competent partner.
Supply of survey teams for Indian Oil Corporation Limited (Panipat refinery & Mathura refinery) we are conducting engineering survey for traversing by total station, bench mark
fixing by Auto level, lines and stakeouts for various construction jobs. Making drawing and reports. From 1-Nov-2003 to may 05.

Highway Project

M/S Larsen & Toubro Limited , Nashik Flyover Project, Maharashtra
GPR Survey for utility detection and survey team for construction work atRoad and flyover project at Nashik . From March 2010 to Dec 2014