1) Most of the equipment is company owned leading to substantial savings in operation costs. Equipment resources include high-end Total Stations, high precision surveying instruments,
2) We have a sophisticated and large CADD centre with high-end workstations, state-of-the-art software, printers and plotters. Similarly we also have a large data bank, reference materials/ documents, publications, project reports and in-house customized software tools.
3) OMSE owns an aesthetically designed office measuring 40,000 sq. ft. in Balasore – at Orissa in India. It has a campus like environment. Customer satisfaction, on-time service and continuous improvement in products and services are prime concern in OMSE’s Business philosophy. Our quality policy ensures that high-class services are always rendered to the client with full consumer satisfaction.
OMSE Quality Control system is supported
- An ISO 9001-2015 certified company.
- Approved Management & Technical Procedures
- Selection criteria of surveyors & helpers
- System and Design Control and Registration Document and
- File Management Document Identification Upgrading of
- Knowledge and Skill Standardization and Upgrading of
- Equipment and Instruments Secured and Safe IT and CADD
- Feedback from the Clients and the Sites
Health, Safety and Environment policy
OMSE maintains strict adherence to Health, Safety and Environment policy in the work environment while providing services to the customer.
Quality Assurance system
To ensure comprehensive project implementation activities carried out and to ensure complete compliance with the drawings, technical specification and various stipulations contained in contract document with high standard of quality assurance.
- Responsible for the timely implementation of the Project
- Close monitoring of the Project during all the stages of survey works.
- Main guiding force to the survey team at site and maintains a watch on the over all activities including quality assurance.
- Close liaison and Coordination with the Employer.
- Providing home office support required if any in implementation of the Project.
- To provide any replacement/reinforcement of the team for efficient and complete the works within the period provided in the contract during the scheduled contract period.
- Responsible for performance / conduct of various personnel provided.
- To work as an agent of the Employer in process of implementation of the project.
- To under take regular site visits, responsible to all activities at site.
- Helps Employer to have full information & opportunity to their views in all matters.
- Test Checking of location of various Chainage, start point, End point, permanent structures cross drainage structures.
- Test Checking of Benchmarks, Co-ordinates, and Reference pillars, T.B.M etc.
- Test Checking of levels for pre- work; post-work as well as at intermediate levels
- Test Checking of setting out of various horizontal and vertical curves.
- Test Checking proposal of temporary works; junction layout, intersection layout etc.
- Test check of lines and levels during surveying activity at site.
- Selection criteria of surveyors & helpers
- System and Design Control
- File Management Document Identification
- Upgrading of Knowledge and Skill Standardization and Upgrading of Equipment and Instruments Secured and Safe IT and CADD
- Feedback from the Clients and the Sites
Safety Policy
All necessary personal safety equipments as considered adequate shall be available for use of persons employed on the Site and maintained in a condition suitable for immediate use; and the OMSE shall take adequate steps to ensure proper use of such equipment by those concerned.
- All workmen at site shall be provided with safety helmets and yellow/orange jackets. Workmen required on site during night hours shall be provided with fluorescent yellow jackets with reflective lopes.
- Safe means of access shall be provided to all working places.
- Adequate precautions shall be taken to prevent danger from electrical equipment. No materials on any of the sites shall be so stacked or placed as to cause danger or inconvenience to any person or the public.
- Provide all necessary flags to protect the public from accidents while working on road.
- Provide signals to prevent accidents to the public.
- All practical steps shall be taken to prevent danger to persons employed, from risk of fire or explosion, or flooding.
- When work is performed near any place where there is risk of drowning all necessary equipment shall be provided and kept ready for use and all necessary steps taken for prompt first aid treatment of all injuries likely to be sustained during the course of the work.
- To ensure effective enforcement of the rules and regulations relating to safety precautions, arrangements made.