Oriman Survey Pioneer in Technical Surveys Contact now

Our Project

Our Projects

Rail Track Project

Indian Railway

1) Pre & Post tamping track measurement survey using AMBERGE trollies system under the jurisdiction of Sr.DEN (East/CKP. (2nd Call) Total -124 KM from Nov. 2019 to till date…

2) Pre & Post tamping track measurement survey using AMBERGE trollies system or similar under the jurisdiction of ADEN(West)/CKP) Total -140 KM from Nov. 2019 to till date…

M/S Larsen&Turbo Limited

i) WDFC , CTP 1 & 2 Project Amberg Trolley operation on rail track under L & T, WDFC Project (CTP 1 & 2) at Jaipur. From Rewari to Abu road – 2200KM from June 2019 to till date…

ii) DMRC CT-11 Project, Bahadurgarh Depot, Haryana Laying Rail track Work, Installation of turnout, Scissors, Derailing switches, Installation of Buffer Stops, Installation of Level Crossing, Installation of Embedded Rail, Ballastless Track with all Fittings and Fastenings etc.. From May 2017 to till date.

iii) EDFC CP 303 Project,Meerut 3D Topographic survey, DGPS Survey, Traversing , bench mark fixing,Trangulation, RoW Validation, cross section, stakeouts, Control Pillar fixing, Bench mark Pillar fixing , Network Adjustment and Processing of Prime Traverse,Structure work, Final location survey, preparing drawing, report by using Various software etc.. From May 2018 to till date.