Supplying survey team with survey equipments for Construction layout, traversing, cross section of cricks, monitoring hydrographical survey, quantity survey, area and volumes calculation and report preparations at RIL, Hazaria for Reliance Industries Limited on behalf of M.S. Associates, Mumbai during 01-10-1995 to 30-09-1997.
Supply of survey team with survey equipments for Topographical & Construction layout, traversing, manual data to computerized format, preparing drawing in AutoCAD format, monitoring hydrographical survey at RPL, Jamnagar for Reliance Petroleum Limited on behalf of Larsen & Tubro Limited (through M.S. Associates), Mumbai during 01-04-1997 to 30-04-1999.
Supplying survey team with survey equipments for Topographical & Construction layout, traversing, cross section, area calculation, etc. Preparing drawing in AutoCAD format at MRPL, Mangalore on behalf of M.S. Associates, Mumbai during 15-02-1997 to 31-03-1999.
Supplying of survey team with survey equipments for Topographical, Construction layout, monitoring hydrographical survey, area and volumes calculation and report preparations, computation of data, preparing project report, method statement & drawings at DPC, Chiplun for Enron on behalf of Larsen & Tubro Limited, Mumbai during 01-12-1999 to 15-04-2001.
Topography survey, contour survey area calculation, volumes calculation, preparing drawing, projects reports preparation in hill terrain of Amby Valley project of Sahara India Housing Ltd. in Lonavala, Maharashtra covering about 2000 acres of area, through M.S. Associates.
Topographical survey of transmission lines for Neyvelli TS II expansion power project, from Pugalur to Madurai, on 400 KV D/C transmission lines (50 kms. Stretch) from 16-10-2004 to 10-11-2004.
- Work done under joint venture with M.S. Associates
- Topographic survey at JNPT for Trafalgar House, Mumbai.
- Detailed pipeline Topographic survey at Jamnagar, Khandala for Reliance Petroleum Ltd., Jamnagar.
- Topographic survey for Thermal power station at Parali (V) for MSEB civil cons. sub. Div. no.4 at Parali (V).
- Topographic survey for OFC in the state of Gujarat for backbone & city for Reliance Telecom Ltd., Ahmedabad.
TUNNEL Supply of survey teams for Delhi Metro Rail Corporation (DMRC) on behalf of International Metro Civil Contractor (a joint venture of DYWIDAG – L&T – SAMSUNG – IRCON – SHIMIZU) the contract for MC1B includes the construction of approx. 6.6 kms underground railway with 6 stations. Out of which 4.1 kms are twin-tube running tunnels and underground station building constructions. The remaining 2.5 kms will be constructed in open cut. Altogether 1 TBM shield and 2 EPBM will be brought into use. The tunnels have an internal diameter of 5.7 m. ORIMAN is responsible for construction surveying and the machine guidance as well as the optional 3D-deformation measurements in the NATM areas. In addition to this, ORIMAN is also responsible for the measuring-technique equipment for the geo-technical. Instrumentation is a part of the contract, we are conducting engineering survey for traversing by total station, bench mark fixing by digital level, 3D monitoring for buildings & lines, stakeouts for various construction job & tunnel survey. Area calculation, preparing drawing, report by using various software like Route fixing, alignment of tunnel, tunnel guiding (VMT Germany system used) and ring fixing. Thirteen teams from 16-05-2001 to 31-03-2005. |
|
Tunnel For D.M.R.C. Delhi (Work done at Khyber Pass Depot – sys-2) DGPS point fixing, traversing, bench mark fixing for AMEL (Airport Metro Express Line) is 26 kms. For Kalindee Rail Nirman (Engineers) Ltd. (sys-3) For Simplex Concrete (India) Ltd. – Dwarka Line For Larsen & Tubro Limited (I.T. Park, Shastri Park) For M/s Larsen & Tubro Limited (Mandi house) For M/s Larsen & Tubro Limited (Udyog Bhawan) ITD CEM-Cementation JV Construction Setting Out Indian Oil Corporation Limited (Panipat refinery & Mathura refinery)
For M/s Larsen & Tubro Limited Supply of survey team for TNRSP-03 road project, Ramnathpuram, Tamilnadu, we are conducting engineering survey for traversing by total station, bench mark fixing taking profile, cross-section, stake-outs for various construction job for road. Area calculation, preparing drawing, reporting by using various software from January 2006 to June 2007. RELIANCE Energy Limited
Oil & Natural Gas Corporation Supply of survey teams (two teams) for pipeline we are conducting engineering survey for traversing by total station, control point fixing by GPS, bench mark fixing, layout for pipelines, stakeouts survey. Area calculation, preparing drawing, reporting using various software from February 2006 to March 2007. ITD Cementation India Limited
M/s Larsen & Tubro Limited
SAKET STATION for DMRC – supply of two survey teams. Simiju Corporation, New Delhi Topographic Survey, Contour Survey at Bhiwadi, Rajasthan. SMCC Construction India Limited, New Delhi To locate all permanent structures/ features like buildings, roads, wells, tube wells, culverts, drains/ nallahs, etc. plotting all details on the drawings. Taking spot levels at an interval of 5m/ 10m both sides of grid with reverence to standard datum levels. Drawing of contours at suitable intervals, measuring of the plot boundaries, plotting diagonals and calculating the area of the project. Preparing drawings on AUTOCAD and submitting soft copy of the same. Measuring magnetic meridian at the station free from local attraction & marking it on the drawings for Neemrana project. M/s Toyo Engineering Corporation Survey contract for Panipat refinery at naphtha cracker plant and MSQ, we are conducting engineering survey for traversing by total station control point, bench mark fixing, stakeouts for various construction job layout for road. Area calculation, preparing drawing, reporting using various software from November 2006 to August 2008. Senbo Engineering Limited Details 3D Topographic survey, cross section, contour survey, traversing, bench mark fixing, pillar making, alignment marking, pile point marking and various construction setting out jobs for AMEL c4 project. Supply of survey team for I.G.I. Airport, New Delhi, we are conducting engineering survey for traversing by total station, bench mark fixing by Auto level, lines and stakeouts for various construction jobs. Making drawing and reporting using various software from 1st April 2007 till date. Topographic survey and GPS control point fixing for proposed IGI Airport and existing airport. Traversing, GPS survey work, bench mark fixing, Topographic survey for IGI airport and leveling work. Six teams from March 2007 till date. M/s Leighton Limited We are conducting engineering survey for traversing by total station control point, bench mark fixing and stakeouts for various construction jobs layout for road. Area calculation, preparing drawings, reporting using software from June 2007 to June 2008. M/s Gammon India Limited Project: Civil and architectural work for Design and construction of sea water intake structure, intake submarine tunnel, approach jetty and seal well for outfall structure for 500 MW Prototype Fast Breeder Reactor (PFBR) at Kalapakkam (Baba atomic power project). Tunnel survey with profiler, nadir, boom laser and all profile taking, alignment marking, monitoring control point, etc. M/s Aluwalia Contractors Limited, New Delhi Project: Construction of Talkatora Stadium, New Delhi for Commonwealth Games. We are conducting engineering survey for traversing by total station, bench mark fixing by Auto level, lines and stakeouts for various construction jobs. Making drawings and reports from February 2009 till date. Project:
We are conducting engineering survey for traversing by total station control point, bench mark fixing, layouts for various construction foundation and profile marking for tunnels. Area calculation, preparing drawings, reporting using software from January 2009 till date. |